Tender Notice for the Renovation Project of the Tianyuan Building Employees’ Kitchen
Visits:
125
Tender Documents
Hangzhou Tianyuan Building Co., Ltd. is conducting an open tender for the “Renovation Project of the Tianyuan Building Employee Kitchen,” with details as follows:
1 Tender No.: TYDS-2023-004
2 Project Name: Renovation project for the staff kitchen at Hangzhou Tianyuan Building.
3 Project Overview: The staff kitchen on the 1st floor of Tianyuan Building is undergoing partial adjustments and repairs to its kitchen equipment, as well as its water and electrical systems.
4 Funding source: Self-funded with own capital.
5 Construction period requirements: No more than 20 days shall elapse from the date of contract signing.
6 Contracting Method and Scope of Contract:
(1) Lump-sum construction contract: covers labor, materials, quality, schedule, and safe and civilized construction.
(2) Scope of Contract: Includes, but is not limited to: repairs and replacements of walls, floors, tap water valves, ceilings, strong (and weak) current outlets, wall openings, water (and electrical) pipes, kitchen appliances, and more.
7 Qualification requirements for eligible bidders:
(1) Possessing independent legal personality;
(2) Possess professional contracting qualifications for architectural decoration and renovation projects;
(3) Units whose legal representatives are the same person or that have direct controlling or management relationships with each other shall not simultaneously participate in bidding for the same contract.
(4) This project does not accept bids submitted by joint ventures.
8 · Engineering quality requirements: Construction shall be carried out strictly in accordance with the current national construction and acceptance specifications, quality inspection and evaluation standards, relevant documents issued by the national industry authorities guiding engineering construction, and the contents of the tender documents. The quality of the project must meet the standards specified in the "Code for Acceptance of Construction Quality" and the GB 50016-2006 Code for Fire Protection Design of Buildings. The warranty period for quality assurance is two years.
9 Material brand requirements Domestic or international brand
10 Construction site inspection time: On-site inspections will not be conducted uniformly; each bidding unit will conduct its own inspections.
11、 There will be no centralized Q&A session prior to bidding. Any questions from bidders will be answered by the procuring entity and provided in a unified written response.
12 、Bidding method: Public Tender
13. Registration Period:
(1) Time: 2023 _5 Moon 17 As of 2023 5 _Month _21 Closed on Sundays (working hours: 9:00 a.m. to 11:30 a.m. and 2:00 p.m. to 4:30 p.m.).
(2) Location: Engineering Department, Tianyuan Building, No. 2 Qianchao Road, Hangzhou City
(3) Provide a copy of the business license of the corporate entity, enterprise qualification certificates, a power of attorney from the legal representative, photocopies of the ID cards of the legal representative and participating personnel, confirmation of the tender documents (with the official seal of the unit affixed to the tender documents), and a quotation table for the comprehensive unit price. All documents should be sealed in a sealed envelope, and the sealing area of the envelope must be stamped with the bidder’s official seal. The envelope’s outer cover should clearly indicate the name of the tender project, the bidder’s name, and the bidder’s address, and should also bear the markings “Tender Documents” and “To Be Opened at Bid Opening.” If the bidder fails to seal the documents and mark them as required above, the procuring entity shall not be responsible for any misdelivery or premature opening of the bid documents.
14 Bid opening time: 1:00 p.m. on May 22, 2023
15 Composition of the Bid Evaluation Committee: An odd number of five or more people.
16 Evaluation Method: Low-Bid Winning Method (Implementing Two Rounds of Negotiation)
17、 Maximum price: RMB 80,000 (in words: Eighty thousand yuan exactly). Bids exceeding the maximum price limit will be deemed invalid.
18 Contact information:
Tendering Entity: Hangzhou Tianyuan Building Co., Ltd.
Contact: Yang Yungang (13867495789)
Hangzhou Tianyuan Building Co., Ltd.
2023 May 17
| Employee Kitchen Improvement Project Checklist: |
|
|
||||
| Serial number |
Project Name |
Project |
Measurement |
Quantity of work |
Remarks |
|
| 1 |
Drain pipe |
The original 50 cast iron pipe in the kitchen was removed and replaced with a 75 cast iron pipe, which was then reinstalled. |
m |
8.3 |
|
|
| 2 |
Demolish |
Kitchen original floor-to-ceiling water drainage tiles |
square meter |
3.2 |
|
|
| 3 |
Ditch |
The kitchen’s original floor-to-ceiling water drain tiles will be removed and replaced with stainless steel drains. |
m |
10.6 |
|
|
| 4 |
water pipe |
Kitchen water pipe renovation: add 25-gauge galvanized pipe. |
m |
35 |
|
|
| 5 |
Valve |
Add a 25-gauge galvanized pipe valve to the kitchen water supply line. |
Only |
1 |
|
|
| 6 |
Triangle valve |
Kitchen water pipe renovation includes adding a check valve. |
one |
3 |
|
|
| 7 |
Galvanized pipe fittings |
Add 25 galvanized pipe fittings to the kitchen water supply. |
one |
25 |
|
|
| 8 |
Conduit |
Kitchen power renovation includes adding 20KPG conduit. |
m |
55 |
|
|
| 9 |
wire |
Kitchen power renovation: Add 2.5㎡ single-core wire. |
m |
135 |
|
|
| 10 |
Wire box |
Kitchen power renovation includes adding an 86-gang junction box. |
one |
8 |
|
|
| 11 |
Socket panel |
Kitchen power renovation includes adding an 86-type five-hole socket panel. |
Block |
8 |
|
|
| 12 |
Distribution box |
Kitchen power renovation includes adding an exposed 25-circuit distribution box and air switches. |
set |
1 |
|
|
| 13 |
Cable wire |
Kitchen power renovation includes adding a 4x25+1 cable. |
m |
85 |
|
|
| 14 |
Demolish |
Kitchen freezer—add power, remove floor tiles. |
square meter |
2.5 |
|
|
| 15 |
Floor tile |
Add power to the kitchen freezer, remove the floor tiles, and re-lay the floor tiles. |
square meter |
2.5 |
|
|
| 16 |
Three-proof fluorescent lamp |
Add triple-protection dual-tube fluorescent lights to the kitchen. |
cup |
6 |
|
|
| 17 |
Ultraviolet disinfection lamp |
Add a UV disinfection lamp to the kitchen. |
cup |
2 |
|
|
Kitchen equipment
| Serial number |
Device Name |
Product Description |
Quantity |
Unit |
Reference image |
| 1 |
Double-door electric rice steamer |
Instructions: Made from SUS304 stainless steel sheet, with a 1.2mm thick inner liner and 0.8mm thick side panels. Includes one rice divider and two rice scoops, equipped with a high-quality, safe front valve and fitted with premium casters at the base. Comes with a custom-designed, thickened electric heating tube and features an automatic water-inlet system. |
1 |
Taiwan |
|
| 2 |
Stainless steel rice bowl |
Description: Made from SUS304 stainless steel sheet through one-time stretching and forming, with a thickened design and a thickness of 0.8 mm. Specifications: 600*400*48 |
26 |
Only |
|
| 3 |
Two eyes, one soup, stir-fried on a gas stove |
Instructions: Made from SUS304 stainless steel sheet, featuring an all-stainless steel stove body shell. The cooktop surface is 1.5 mm thick, with a rear splash guard and front panel both made of 1.0 mm stainless steel; the side panels are 0.8 mm thick. The main frame is constructed from #4 angle steel. The furnace chamber is lined with fire-resistant bricks. It is equipped with a powerful Cantonese-style burner head and comes with two dedicated 250W fans. The cooktop is fitted with a cooling water system and a swivel cold-water faucet. The water inlet connection is DN15, and the drain outlet is DN38. This model is suitable for natural gas use and is equipped with a flame-out protection device. |
2 |
Taiwan |
|
| 4 |
Catering thermal insulation vehicle |
Brand: Jia Si Te Model: DH-11-21 |
1 |
Taiwan |
|
| 5 |
Water boiler with base |
Brand: Tengfei Model: PK-9H |
1 |
Taiwan |
|
| 6 |
Gas equipment removal |
|
3 |
Taiwan |
|
| 7 |
Gas equipment connection |
Require hard pipe connection |
3 |
Taiwan |
|
| 8 |
Rebuild the legs of the rice-steaming cart. |
The required foot height is 250mm. |
1 |
Taiwan |
|
| 9 |
Equipment handling and installation |
Including moving the dismantled old equipment to the designated location. |
1 |
Item |
|
Relevant updates