Working Hours: 24/7 National Service Hotline
NEWS CENTER
Real-time dynamics
Uniquely ingenious craftsmanship
Poetic Harmony
Public Notice for the Bidding of the “Building Curtain Wall Glass Repair Project” by Hangzhou Tianyuan Building Co., Ltd.
Visits:
124
Hangzhou Tianyuan Building Co., Ltd. is inviting bids for the “Building Curtain Wall Glass Repair Project.” Details are as follows:
1 Tender No.: TYDS-2024-002
2 Project Name: Exterior curtain wall glass repair work for the building
3 Project Overview: No. 2 Qianchao Road, Shangcheng District, Hangzhou City Hangzhou Tianyuan Building Curtain Wall Glass Repair Project.
4 Funding source: Self-funded with own capital.
5 Construction period requirements: No more than 20 days shall elapse from the date of contract signing.
6 Contracting Method and Scope of Contract:
(1) Lump-sum construction contract: Based on the quotation provided by the tendering entity, repairs within the scope of the bill of quantities will be carried out irregularly according to the glass breakage conditions specified by the tendering entity. If the on-site glass dimensions differ from those listed in the bill of quantities by no more than 10 cm, the pricing will be based on the dimensions listed in the bill of quantities. The dimensions must be reconfirmed on-site by the designated unit. The bidding entity must purchase insurance for construction personnel.
(2) The bidding and pricing for this project will be based on a fixed lump-sum unit price (including taxes and other charges).
(3) The scope of work includes the exterior curtain wall glass of the building. The duration of this tender is two years.
7 · Engineering quality requirements: Construction shall be carried out strictly in accordance with the current national construction and acceptance specifications, quality inspection and evaluation standards, relevant documents issued by the national industry authorities guiding engineering construction, and the contents of the tender documents. The quality of the project must meet the standards specified in the "Code for Acceptance of Construction Engineering Quality." The colors of the glass and aluminum alloy must be consistent with those of the building’s curtain wall. The quotation shall include all installation-related costs, and the warranty period shall be two years.
8 Qualification requirements:
Therefore, bidding companies must hold a Grade III or higher qualification for specialized contracting in curtain wall engineering (Grade III certificate).
9 Material Brand Requirements Hangbo, Zhebo, Nanbo, Xinyi
10 Construction site inspection time: The bidding entity shall conduct its own site visit.
11. Registration Period:
(1) Time: 2024 3 Moon 13 Until 2024 3_ Moon _ 15 Closed on Sundays (working hours: 9:00 a.m. to 11:30 a.m. and 2:00 p.m. to 4:30 p.m.).
(2) Location: Engineering Department, Tianyuan Building, No. 2 Qianchao Road, Hangzhou City
(3) Provide a copy of the business license of the enterprise or other organization, a letter of authorization, photocopies of the identification cards of the participating personnel, confirmation of the tender documents (with the official seal of the unit affixed to the tender documents), and a quotation table for the comprehensive unit price, etc.
12 Bid opening time: 2:30 p.m. on March 18, 2024
13 Composition of the Bid Evaluation Committee: 5 Single person or more.
14 Contact information:
Tendering Entity: Hangzhou Tianyuan Building Co., Ltd.
Contact: Yang Yungang (13867495789)
Hangzhou Tianyuan Building Co., Ltd.
2023 March 12




Bid Evaluation Items
| Serial number |
Comment Review Inside Capacity |
Score |
Scoring Criteria |
| 1 |
Quotation |
60 |
The bidder with the lowest overall quote ranks first; the highest score is... 60 Decreasing sequentially 5 Share |
| 2 |
Business license, industry qualifications, |
10 |
There is. 10 Points—no score is not allowed. |
| 3 |
Response time for maintenance requests |
10 |
In the event of an emergency repair 12 Arrive within the hour. 10 Divide; 24 Arrive within hours 5 Share |
| 4 |
If quality issues arise during repairs, we commit to taking appropriate follow-up measures. |
10 |
Fully responsive 10 Points, partial credit awarded. 1-8 Share |
| 5 |
Unit Performance |
5 |
Collaboration cases equivalent to the scale of our own unit, 1 Home 1 Points—no points if not awarded. |
| 6 |
Other services and offers available |
5 |
Fully responsive 5 Points, partial credit awarded. 1-4 Share |
Relevant updates