Public Notice for the Bidding of the “Kitchen Equipment Demolition and Relocation Project on the 3rd Floor of Tianyuan Building”
Visits:
118
Tender Documents
Hangzhou Tianyuan Building Co., Ltd. is conducting an open tender for the “Removal and Relocation Project of Kitchen Equipment on the 3rd Floor of the Building.” Details are as follows:
1 Tender No.: TYDS-2024-008
2 Project Name: Kitchen demolition and relocation work on the 3rd floor of the building
3 Project Overview: No. 2 Qianchao Road, Shangcheng District, Hangzhou City The kitchen equipment on the 3rd floor of Hangzhou Tianyuan Building has been dismantled and moved to the designated location.
4 Funding source: Self-funded with own capital.
5 Construction period requirements: No more than 20 days shall elapse from the date of contract signing.
6 Contracting Method and Scope of Contract:
(1) Lump-sum construction contract: covers labor, materials, quality, schedule, and safe and civilized construction.
(2) Scope of Contract: Demolish kitchen equipment and transport it to the designated location, taking care to ensure personnel safety and protect facilities and equipment during transportation.
7 、Quality requirements for the project:
Construction shall be carried out strictly in accordance with the current national construction and acceptance specifications, quality inspection and evaluation standards, relevant documents issued by the national industry authorities guiding engineering construction, and the contents of the tender documents. The quality of the project must meet the standards specified in the "Construction Project Quality Acceptance Specifications" and pass the acceptance inspection conducted by the relevant authorities. The warranty period shall be two years.
Bidders shall independently inspect the site and prepare a detailed quotation list, ensuring that the final repairs pass the tenderer’s acceptance inspection; otherwise, the corresponding payment will not be made.
8 Qualification requirements:
(1) Bidders shall be registered within the territory of the People’s Republic of China.
(2) This project does not accept bids submitted by joint ventures.
9 Material Brand Requirements :
10 Construction site inspection time: The bidding entity shall conduct its own site inspection.
11. Registration Period:
(1) Time: 2024 5 Moon 20 Until 2024 5_ Moon _ 22 Closed on Sundays (working hours: 9:00 a.m. to 11:30 a.m. and 2:00 p.m. to 4:30 p.m.).
(2) Location: Engineering Department, Tianyuan Building, No. 2 Qianchao Road, Hangzhou City
(3) Provide a copy of the business license of the enterprise or other organization, a letter of authorization, copies of the identification cards of the participating personnel, confirmation of the tender documents (with the official seal of the tender documents), and the comprehensive bid document.
12 Bid opening time: 2:30 p.m. on May 23, 2024
13 Composition of the Bid Evaluation Committee: 5 Single number of one or more people.
14 Evaluation Method: Comprehensive Evaluation
15、 Maximum price: RMB 12,000 (in words: Twelve Thousand Yuan exactly). Bids exceeding the maximum price limit will be deemed invalid.
16 Contact information:
Tendering Entity: Hangzhou Tianyuan Building Co., Ltd.
Contact: Yang Yungang (13867495789)
Hangzhou Tianyuan Building Co., Ltd.
2024 May 19
Bid Evaluation Items
|
Serial number |
Comment Review Inside Capacity |
Score |
Scoring Criteria |
|
1 |
Quotation |
60 |
The bidder with the lowest overall quote ranks first; the highest score is... 60 Decreasing sequentially 5 Share |
|
2 |
Construction safety measures and commitment to follow-up measures in case of issues |
25 |
Fully responsive 25 Points, partial credit awarded. 1-15 Share |
|
3 |
Unit Performance |
5 |
Cooperation cases of comparable scale to this unit (provide contract), 1 Home 1 Points—no points if not awarded. |
|
4 |
Other services and offers available |
10 |
Fully responsive 10 Points, partial credit awarded. 1-8 Share |
Relevant updates