Public Notice for the Bidding of the Maintenance Project for McQuay Centrifugal Compressors at Hangzhou Tianyuan Building’s Central Air Conditioning System
Visits:
38
Hangzhou Tianyuan Building McQuay Central Air Conditioning
Centrifugal Compressor Maintenance Project
Recruit
Mark
Text
item
Inquirer: Hangzhou Tianyuan Building Co., Ltd.
2025 July of the year 27th
Table of Contents
Chapter One Tender Notice............................................................ 3
Chapter Two Instructions for Bidding............................................................ 5
Chapter Four Tender Document Format....................................................... 11
Chapter One Tender Notice
Tender Notice for the Repair of McQuay Centrifugal Compressors at Hangzhou Tianyuan Building’s Central Air Conditioning System
1 Tender Conditions
This bidding project involves the maintenance of McQuay central air-conditioning compressors. The project owner is Hangzhou Tianyuan Building Co., Ltd., and the funding source is self-raised, proprietary funds. The project now meets the conditions for tendering and is hereby publicly solicited. 2 Project Overview and Scope of Tender
2.1 Project Overview The equipment requiring maintenance this time is Centrifugal Chiller No. 1—McQuay central air conditioning unit—located in this building. The equipment model is WSC087MAT57F/F3612/C3612, and there is one unit in total. During operation, the compressor was emitting a high-pitched screeching sound, prompting the operator to immediately shut down the unit.
2.2 Scope of the tender Repair the aforementioned McQuay central air-conditioning compressor, including but not limited to fault diagnosis, replacement of damaged components (if necessary), and commissioning, to ensure that the compressor returns to normal operating condition. Specific details shall be subject to the tender documents and relevant technical requirements.
3 Bidder Qualification Requirements
3.1 Possesses independent legal personality, is capable of independently assuming civil liabilities, and holds a valid business license.
3.2 Possess qualifications related to central air-conditioning maintenance, with priority given to those holding manufacturer-authorized service qualification certificates from McQuay.
3.3 We have a professional maintenance team whose members hold the relevant professional qualification certificates and possess extensive experience in servicing central air-conditioning compressors. We require proof of maintenance performance for similar projects over the past three years (e.g., copies of contracts).
3.4 Possesses good business integrity and a sound financial accounting system, with no significant records of violations or illegal activities in the past three years.
3.5 Possesses the equipment and specialized technical capabilities necessary to perform the contract and can ensure that the repair work is completed within the specified timeframe.
4 Submission of Bidding Documents (Physical and Electronic Files)
The deadline is August 1, 2025, 4:00 PM 。
Recipient email: hoteL@tianyuantower.com 。
Recipient Address: No. 2 Qianchao Road, Sijiqing Subdistrict, Shangcheng District, Hangzhou City
4.1. Bids submitted after the deadline will not be accepted by the inquirer.
5. Bidders shall independently visit the project site for inspection.
6 Bid opening time: August 5, 2025, 2:30 PM 。
7 The medium for issuing the announcement Hangzhou Tianyuan Building Co., Ltd. Hotel Official Website ( www.tianyuantower.com )
8 Contact information :
Tendering party: Hangzhou Tianyuan Building Co., Ltd.
Office Address: Engineering Department, Tianyuan Building, No. 2 Qianchao Road, Hangzhou City
Contact person and phone number: Yang Yungang, 13867495789.
Email: hotel@tianyuantower.com 。
Hangzhou Tianyuan Building Co., Ltd.
2025 July 27
Chapter 2: Instructions for Bidding
1. Quotation document
1.1 Bidding Preparation Basis: Bidders shall prepare their bids based on the technical requirements and maintenance quotations provided by the tenderer.
1.2 Quotation Composition
1.2.1 The quoted prices include the procurement, manufacturing, installation, warehousing, packaging, delivery, and transportation of all products and equipment, as well as any related import duties and charges for equipment and materials, contingency fees, commissioning, technical services and training, provision of relevant documents and data, free warranty and maintenance services for the agreed period, taxes and levies, profit, and all other necessary and indispensable expenses required to fulfill the contract.
1.2.2 When submitting a quotation, the product’s material, specifications, manufacturing process, technical parameters, warranty period, and other relevant details must comply with the bidder’s explicit requirements.
2. Quote validity period
2.1 The quotation is valid for 30 days.
2.2 During the validity period of the quotation, if the bidder withdraws or modifies its quotation document, it shall bear the responsibilities stipulated in the quotation document and by law.
3. Clarification of the Bid Document
3.1 Bidders should carefully read and review the entire content of the bidding documents. If they have any questions, they should submit their inquiries in writing or via email according to the following schedule, requesting the tenderer to clarify the bidding documents.
Deadline for bidders to raise questions: 4:30 p.m. on July 30, 2025. Time for the tenderer to issue clarifications on tender documents: 5:30 p.m. on July 31, 2025.
3.2 Clarifications to the bidding documents will be provided in writing or via email to all bidders, without identifying the source of the clarification questions.
4 Tender document's Submit
4.1 Please provide one complete set of tender documents in electronic format, in PDF format.
4.2 The bidding document shall specify: a. Project number; b. Project name; c. Name of the bidder; d. Name of the legal representative of the bidder or name of the authorized agent.
4.3 The bidding document shall be stamped with the official seal of the bidder at the designated location and signed or sealed by the legal representative or their authorized agent. Any bidding document that has not been stamped by the bidder and signed or sealed by the legal representative or their authorized agent shall be deemed invalid.
4.4 The bidding documents shall be written or printed using non-fading materials and signed by the legal representative of the bidder or their authorized agent, or stamped with the official seal of the bidder’s organization. If an authorized agent signs the documents, the bidding documents must be accompanied by a power of attorney signed or sealed by the legal representative. Bidding documents should, as far as possible, avoid alterations, insertions between lines, or deletions. Should any of the above situations occur, the altered sections must be affixed with the official seal of the bidder’s organization or confirmed by the signature of the legal representative of the bidder or their authorized agent.
5. Intellectual property
5.1 The bidder shall ensure that it holds legitimate intellectual property rights to the products it sells. If the tenderer suffers damages due to the products infringing upon the intellectual property rights of others, the bidder shall bear such losses and assume liability for breach of contract.
6 .Review Review
6.1 Review Panel
6.1.1 The bidder shall form the evaluation panel independently.
6.1.2 Members of the review panel shall recuse themselves if any of the following circumstances apply:
(1 ) Close relatives of the bidder or the principal person in charge of submitting the bid;
(2 ) Personnel from the project supervisory authority or the administrative oversight authority:
(3 ) Has an economic interest relationship with the bidder;
(4 ) Has previously been subject to administrative or criminal penalties for engaging in illegal activities during price inquiries, bidding, bid evaluation, and other activities related to tendering and bidding;
(5 ) Has other interests or relationships with the bidder.
6.2 Evaluation Principles
The review process adheres to the principles of fairness, impartiality, scientific rigor, and selection of the best candidates.
6.3.1 If, during the bidding deadline and the evaluation period, the number of valid bidders falls below three, the tendering party may, based on the actual situation, decide whether to continue the bidding process according to the original bidding method.
6.3.2 Evaluation Criteria: The procuring entity will conduct a comprehensive evaluation of all bidders to determine the tender results. The evaluation plan is as follows:
Scoring Sheet:
|
Serial number |
Scoring factors |
Score |
Scoring Criteria |
|
1 |
Quotation |
60 |
The bidder with the lowest overall quote ranks first. The highest score is 60 points, and subsequent scores decrease by 5 points each. |
|
2 |
Performance and Reputation |
10 |
Scoring will be based on the bidder’s performance in similar projects over the past 3 years and their commercial reputation (2 points awarded for providing a copy of the contract). Score: 0–10 points. |
|
3 |
Maintenance Plan |
20 |
A comprehensive score of 0 to 20 points will be awarded based on the rationality and feasibility of the bidder’s project organization and implementation plan (including maintenance procedures, technical measures, quality assurance, project duration, project implementation schedule, and qualifications of project personnel). |
|
4 |
After-sales Service Plan |
10 |
A comprehensive score—ranging from 0 to 10—is assigned based on the bidder’s after-sales service plan, warranty period, mechanisms for ensuring service commitments, technical capabilities for after-sales service and maintenance, and response time to faults. |
7 Bid opening time: 2:30 p.m. on August 5, 2025
8 . Tender Result
8.1 Result Notification
Within the validity period of the quotation specified in Section 2.1 of this chapter, the procuring entity shall publicly announce the results of the bid opening. The announcement period shall be three days. Upon expiration of the announcement period, the procuring entity shall notify the bidders of the bid opening results in writing or electronically.
8.2 Performance Guarantee
8.2.1 After receiving the notice of award, the successful bidder must provide the following to the tendering party when signing the contract: Performance bond Performance bond: RMB 5,000 in total, to be paid via bank transfer. The performance bond shall be paid to the tenderer within 5 days after the contract is signed. If the successful bidder refuses to pay the performance bond, the tenderer will revoke the bidder’s qualification as the successful bidder. The performance bond will be refunded without interest within 30 days after the completion and acceptance inspection are passed.
8.3 Sign the contract
8.3.1 Opening of bids The bidder ranked first in the results shall... Within 5 working days after the expiration of the public notice period for bid opening results, Sign a procurement contract with the bidding entity,
8.3.2 If a bidder refuses to sign the contract without justifiable reasons, the procuring entity shall disqualify the bidder and the bidder shall also compensate for any losses incurred by the procuring entity.
9 Supply cycle
9.1 The product delivery cycle shall meet the requirements and provisions regarding the delivery period stipulated in the procurement contract.
10 Payment and Settlement Terms for Goods
10.1 The specific method shall be subject to the terms of the procurement contract.
- Technical standards and requirements
1 、Maintenance Qualification Requirements
The maintenance unit must possess qualifications for central air-conditioning maintenance and have experience in equipment repair, and must provide valid supporting documentation.
2 Fault Detection Technical Requirements
2.1 A comprehensive inspection of the compressor in central air-conditioning unit No. 2 is required, including but not limited to checking the insulation resistance of the motor windings and inspecting the internal components of the compressor.
2.2 The testing process must result in a detailed test report that clearly identifies the faulty component, the cause of the failure, and the relevant data supporting the findings. The report must be signed and approved by the technical supervisor.
2.3 For any potential fault hazards detected, targeted preventive recommendations must be included in the report.
3 Component Replacement Technical Requirements
3.1 The replaced compressor components must be genuine, factory-produced parts from McQuay, and must come with the factory certificate of conformity as well as relevant documentation confirming compatibility with the equipment model.
3.2 If, due to special circumstances, non-original manufacturer parts must be used, prior written consent from the tendering party is required. Moreover, the performance parameters of these parts must not be lower than the standards for the original manufacturer’s parts, and a test report issued by an authoritative third-party organization must be provided.
3.3 The component replacement process must be carried out strictly in accordance with the installation manual and maintenance specifications for McQuay centrifugal compressors, ensuring that installation accuracy meets the required standards.
4 Maintenance Process and Technical Requirements
4.1 When disassembling and repairing the compressor, the work must be carried out in a clean, dry environment to prevent impurities from entering the compressor interior. 4.2 All wear parts, such as bearings and seals, must be completely replaced, and relevant data must be recorded during the replacement process.
4.3 During assembly, the tightening torque for each connection point must comply with the manufacturer’s specifications and be verified by a dedicated person.
5 Debugging Technical Requirements
5.1 The repaired compressor must undergo a trial run and commissioning. The commissioning process must follow the commissioning procedures specified by the McQuay manufacturer.
5.2 The trial run shall last for no less than 48 hours. During this period, all operational parameters of the compressor—such as suction pressure, discharge pressure, oil temperature, oil pressure, and motor temperature—must be monitored in real time to ensure that these parameters remain within the equipment’s normal operating range. 5.3 After successful commissioning, a detailed commissioning report must be provided to the tenderer, including parameter records from the trial operation period and commissioning conclusions.
6 Quality Assurance Technical Requirements
6.1 The compressor will be covered by a warranty of at least 2 years following repair. During the warranty period, if any failure occurs due to the quality of the repair work or the quality of replaced components, the repair provider must arrive on-site within 24 hours of receiving notification and bear the corresponding repair costs.
6.2 During the warranty period, the maintenance unit shall conduct a follow-up inspection of the compressor once every month, record the equipment’s operating condition, and promptly identify and address any issues.
7 Safety technical requirements
7.1 During the maintenance process, it is essential to strictly adhere to national and industry safety operating procedures and to establish comprehensive safety protection measures to ensure construction safety.
7.2 Maintenance personnel must wear the necessary safety protective equipment, such as hard hats, safety belts, and insulated gloves.
7.3 The construction site must be equipped with clear safety warning signs to prevent unauthorized personnel from entering.
Chapter 4: Tender Document Format
Hangzhou Tianyuan Building McQuay Central Air Conditioning
Centrifugal Compressor Maintenance Project
Tender document
Invest Mark Person: (Seal)
Legal Representative or their authorized agent: (Signature or Seal)
Date: Year Moon day
Table of Contents
1. Tender documents and detailed quotation list;
II. Application Documents for Qualification Review:
- Statement of Integrity;
- Original Power of Attorney for the Bid Document;
- A copy of the business license (with the official company seal affixed);
- Bidder General Information Form (with official seal);
To: Hangzhou Tianyuan Building Co., Ltd.:
1 . According to your side {Project Name} We have carefully studied the tender documents and, having fully understood and mastered the bidding instructions, technical standards, requirements, and other relevant documents for this project, we hereby undertake to provide the corresponding goods, technical services, and warranty-period services as specified in the tender documents, in accordance with the quotation proposal set forth below (see Attachment 1, “Detailed Quotation Table”), and to fulfill our obligations as stipulated in the contract.
2 We have thoroughly reviewed all tender documents, including any amendment documents (if applicable) and relevant attachments.
3 We guarantee to complete the repair work in accordance with the requirements stipulated in the contract.
4 We agree that the submitted bid documents shall remain valid and binding within the quotation validity period specified in the bid documents.
5 We will participate in the bidding strictly in accordance with the relevant regulations on project bidding and tendering as well as the provisions of the tender documents. We understand that you are not obligated to accept the lowest-priced bid, nor are you required to provide any explanation for the bidding results. Should we be awarded the contract, we will sign a contract with you within 30 days from the date of receiving your notice of award, in compliance with the terms stipulated in the notice of award, the tender documents, and this bid document, and will fulfill all responsibilities and obligations as prescribed.
Bidder: (Seal) Unit Address:
Legal Representative or their authorized agent: (Signature or Seal)
Contact phone number:
Date: _____ year ____ month ____ day
Quotation Details List
Quoter: Date:
|
Serial number |
Product Name |
Model/Version |
Quantity A |
Unit |
Unit price B |
Total price C = A * B |
Note |
|
1 |
|
|
|
|
|
|
|
|
2 |
|
|
|
|
|
|
|
|
3 |
|
|
|
|
|
|
|
|
4 |
|
|
|
|
|
|
|
|
5 |
|
|
|
|
|
|
|
|
6 |
|
|
|
|
|
|
|
|
7 |
Value-Added Tax (VAT) amount |
Based on the total price of the equipment % Calculation |
|
|
|||
|
8 |
Total |
Chinese currency amount in capital letters: |
|
|
|||
Note:
1 The quoted prices include all costs associated with the procurement, manufacturing, installation, warehousing, packaging, delivery, and transportation of the products and equipment, as well as any related import duties and charges for equipment and materials, contingency fees, commissioning, technical services and training, provision of relevant documents and data, free warranty and maintenance services for the agreed period, taxes and levies, profit, and all other necessary and indispensable expenses required to fulfill the contract.
II. Application for Qualification Review
Statement of Integrity
Myself (Legal representative, ID number) We hereby solemnly declare that our company is participating in... (Project Name) All submitted documents, entered data, and attached materials are true, legal, and valid. Likewise, the statement I make herein is also true and valid. I am willing to assume responsibility for the findings of any investigations conducted by the relevant authorities during the quotation process.
If any of the quotation materials submitted by this company are found to be false, we are willing to accept the penalties imposed by the relevant administrative authorities in accordance with applicable laws and regulations.
(Official Seal)
Legal Representative: (Signature)
Year Month Day
Letter of Authorization for the Bid Document
This power of attorney states: I (Name) is (Bidder Name) The legal representative hereby authorizes and entrusts... (Bidder Name) of the (Name) Sign for my company { Project Name} The authorized agent designated by the legal representative of the quotation document hereby confirms that the agent is fully authorized to represent me in signing the contents of this quotation document for the project.
The agent has no authority to subdelegate; hereby entrusted.
Agent: , ID number:
Bidder: (Official Seal)
Legal Representative: (Signature or Seal)
Date of Authorization: Year Month Day
Attachment: Photocopies of the legal entity’s and agent’s identification cards
Bidder General Information Form
|
Bidder Name |
|
||||||
|
Registered address |
|
Postal code |
|
||||
|
Contact Information |
Contact person |
|
Phone |
|
|||
|
Fax |
|
Website |
|
||||
|
Legal Representative |
Name |
|
Technical Title |
|
Phone |
|
|
|
Technical Lead |
Name |
|
Technical Title |
|
Phone |
|
|
|
Establishment Date |
|
||||||
|
Enterprise Qualification Level |
|
||||||
|
Unified Social Credit Code |
|
||||||
|
Registered capital |
|
||||||
|
Opening bank |
|
||||||
|
Account |
|
||||||
Note: 1. Photocopies of business license, authorization agency certification documents, etc.
Relevant updates