Tender Notice: Maintenance of Low- and High-Voltage Switchgear in Tianyuan Building
Visits:
106
Hangzhou Tianyuan Building Co., Ltd. is conducting an open tender for “Maintenance of Equipment in the High- and Low-Voltage Switchgear Rooms of Tianyuan Building.” Details are as follows:
1 Tender No.: TYDS-2023-010
2 Project Name: Hangzhou Tianyuan Building High- and Low-Voltage Switchgear Room Maintenance Project.
3 Project Overview: Replacement and maintenance of indicator lights, control panels, high-voltage current transformers, and other power supply equipment in the distribution room of Tianyuan Building.
4 Funding source: Self-funded with own capital.
5 Construction period requirements: No more than 20 days shall elapse from the date of contract signing.
6 Contracting Method and Scope of Contract:
(1) Lump-sum construction contract: covers labor, materials, quality, schedule, and safe and civilized construction.
(2) Scope of Contract: The guarantee covers, but is not limited to, the replacement and commissioning of damaged equipment such as indicator lights, high-voltage current transformers, high-voltage multifunction meters, transformer fans, and transformer temperature controllers.
7 Specific construction requirements:
The replaced equipment meets industry standards and poses no safety risks during use.
8 Qualification requirements for eligible bidders: None.
9 · Engineering quality requirements: Construction shall be carried out strictly in accordance with the current national construction and acceptance specifications, quality inspection and evaluation standards, relevant documents issued by the national industry authorities guiding engineering construction, and the contents of the tender documents. The quality of the project must meet the standards specified in the "Code for Acceptance of Construction Quality" and the GB 50016-2006 Code for Fire Protection Design of Buildings. The warranty period for quality assurance is one year.
Bidders shall independently inspect the site and prepare a detailed quotation list, ensuring that the final repairs pass the tenderer’s acceptance inspection; otherwise, the corresponding payment will not be made.
10 Material Brand Requirements : Same brand
11 Construction site inspection time: On-site inspections will not be conducted in a unified manner; each bidding unit will conduct its own inspections.
12、 There will be no centralized Q&A session prior to bidding. Any questions from bidders will be answered by the procuring entity and provided in a unified written response.
13 、Bidding method: Public Tender
14. Registration Period:
(1) Time: 2023 _6 Moon 26 As of 2023 6 _Month 30 Closed on Sundays (working hours: 9:00 a.m. to 11:30 a.m. and 2:00 p.m. to 4:30 p.m.).
(2) Location: Engineering Department, Tianyuan Building, No. 2 Qianchao Road, Hangzhou City
(3) Provide a copy of the business license of the legal entity, a letter of authorization from the legal representative, photocopies of the ID cards of the legal representative and participating personnel, confirmation of the tender documents (with the official seal of the unit affixed to the tender documents), and a quotation table for the comprehensive unit price, among other documents.
15 Bid opening time: 2:30 p.m. on July 3, 2023
16 Composition of the Bid Evaluation Committee: An odd number of five or more people.
17 Bidding evaluation method: Lowest-price bidding
18、 Maximum price: RMB 26,000 (in words: Twenty-six thousand yuan exactly). Bids exceeding the maximum price limit will be deemed invalid.
19 Contact information:
Tendering Entity: Hangzhou Tianyuan Building Co., Ltd.
Contact: Yang Yungang (13867495789)
Hangzhou Tianyuan Building Co., Ltd.
2023 June 26
Parts Replacement List:
|
Serial number |
Material Name |
Quantity |
Unit |
Note |
|
1 |
Transfer switch |
1 |
Only |
4G Outgoing switchgear on-off conversion switch |
|
2 |
PT Metering voltage transformer |
3 |
Only |
PT in the arrester cabinet |
|
3 |
Multifunctional watch |
3 |
Only |
1G 5G, 7G cabinet |
|
4 |
Fuse |
3 |
Only |
P12 Capacitor cabinet, first from the left |
|
5 |
Contactor |
1 |
Only |
P12 Capacitor cabinet, first from the left |
|
6 |
Transformer fan |
1 |
Only |
|
|
7 |
Indicator light |
82 |
Only |
|
|
8 |
Transformer Temperature Control |
1 |
Only |
|